Located at the entrance to the city, within the Lebon-Lamartine district in Villejuif, and benefiting from the major axis of Stalingrad Avenue, the project is situated on a small plot adjoining the important "Orange Prisme" program carried out by Icade on the same block and delivered in 2020.
As part of the urban renewal initiative launched in this priority area, it constitutes an important entry point into the city and the future Lebon-Lamartine district. Like the Orange Prisme building, the entire complex must therefore showcase the city's ambitions in terms of architectural quality and living comfort.
The aim is therefore to accommodate on this narrow plot a program of approximately 4500m² of social housing, intermediate market-rate housing and shops.
To make the most of the limited plot size, the building volumes take advantage of the three adjacent streets, aligning with the streetscape and thus freeing up maximum space in the heart of the block. The nine-story building is designed to be compact. To lighten its visual appearance and resolve any overlooking issues with the south facade of the Prisme Orange, we have implemented a segmented design, which breaks up the building and shapes its profile within the public domain.
At the northern boundary, we are maintaining a distance of at least 8 meters from the adjacent building. This creates an urban gap running through the block from west to east, which expands in the heart of the block to accommodate a garden that future residents can use. In this way, light, nature, and users occupy this small central space, bringing it to life from the public area and making it a vibrant place to live.
| Name | 68 housing units in Villejuif |
| Typology | Habitat |
| status | Under construction |
| Location | Avenue de Stalingrad, 94800 Villejuif |
| Client | ICADE + KER PROMOTION |
| Team | Sodeba Ginko BE TCE/Altia acoustician/SG Landscape |
| Program | 68 family dwellings including 43 LLI (Intermediate Rental Housing) and 25 LLS (Social Rental Housing), 1 commercial premises, 1 underground car park with 31 spaces Landscaping of green spaces |
| Certifications Labels | RE2020 threshold 2025 NF Habitat HQE label |
| Surface | 4521 m² GFA – 4321 m² (residential) + 200 m² (commercial) |
| Budget of works | €7.2M excluding VAT |
| Planning | PC: June 2025 – Final delivery: June 2027 |


























































































































































