typology: Mobility

  • Gare RER, Fontenay-Sous-Bois (94)

    RER station, Fontenay-Sous-Bois (94)

    Bridge building

    In accordance with laws on bringing buildings into compliance and making them accessible to disabled people, RATP has decided to make its stations on the RER network, and in particular line A, accessible to people with specific needs.

    The project involves creating an additional access point equipped with two elevators serving each platform and the roads located on either side of the railway platform. Stairs complete the connection between the platform and the control room. The link between the streets and the elevators is provided by a footbridge spanning the railway tracks.

    Based on these constraints, the firm optimized the technical program by designing a "Bridge Building" that spans the railway "canyon," thus restoring the urban connection between the two sides of the city. To ensure the crossing complies with railway clearances, the steel bridge structure is supported solely by two lateral concrete abutments housing the elevator shafts. Its rectangular shape and simple volume allow for prefabrication of the structure on a dedicated site, on a platform offset from the tracks. The structure is further encased in a metallic envelope composed of a grid of perforated diamond shapes.

    Once assembled, this structure was lifted in a single night and placed on its two supports. It is connected to the city's "banks" and the quays below by a footbridge and a staircase made of a thin steel structure clad, like elevator columns, with an attached glass "skin".

    Program RER station
    Place Fontenay-sous-Bois (94)
    Client RATP
    Price €4.7 million excluding VAT
    Surface : 380 m²
    Calendar Delivery 2009
    Numerical data Steel tonnage: 92 tonnes on the night of the lift (metal structure only), maximum span: 32m – total weight: around 192 tonnes

  • Poste de commandes centralisées de la ligne 13

    Centralized control station for line 13

    Less x Less = More

    Sometimes in architecture, as in mathematics, Minus x Minus = Plus.

    The cluster of negative constraints accumulated on this project proved to be a rich potential for creative expression where each point was the subject of an architectural translation.

    The building's volume is integrated into the geometry of the rear of the plot and opens up in relation to the embankment. This arrangement reinforces the desire for a green corridor and harmonizes the various alignments, including future constructions.

    The impossibility of opening up views onto the main facade of the building led us to make this facade translucent and to locate the circulation areas around the perimeter.

    Distributions thus become the main tool for managing urban planning rules and acoustic constraints while contributing to the atmosphere of the place and the aesthetics of the project.

    The pursuit of translucency led us to choose polycarbonate as the primary facade material. Studying its characteristics prompted us to focus the project's design on a play of light. The architectural object thus becomes a precise interplay between transparency and reflection, opacity and light.

    Program Control room, technical spaces, management offices, executive offices, meeting rooms, redevelopment of the Etienne Dolet metro station, urban treatment
    Place : Etienne Dolet Station, Malakoff (92)
    Client RATP/SEDP
    Price €7 million excluding VAT
    Surface : 1800 m²
    Calendar Delivery 2014

EN